Orangeries UK

Period Property Orangeries in Notting Hill

Traditional stone orangery with arched windows on a Georgian country house

Our team in Greater London covers Notting Hill for orangeries for period and listed homes, taking the job from measured survey through to a finished, certified room. In smaller places like Notting Hill, plots are often larger and gardens deeper, which opens up the design options.

A period property orangery is designed to sit comfortably against a Georgian, Victorian, Edwardian or older house, using proportions, mouldings and materials taken from the building itself. On listed buildings and in conservation areas it also has to satisfy the council's conservation officer.

What does a period property orangery cost in Notting Hill?

£68,000 – £149,000Guide price before VAT, typical 20–30m² room, London rates

Guide prices for orangeries for period and listed homes around Notting Hill run from £68,000 to £149,000 before VAT (typical 20–30m² room). We price to the rates that apply in London, and the quote you receive after survey is the price you pay unless you change the design.

What does the work cover?

  • Lime mortar and traditional pointing where appropriate
  • Heritage statement and listed building consent application
  • A light-touch junction that can be read as a later addition
  • Measured survey of the existing elevation and its details
  • Painted hardwood or Accoya joinery with slim glazing bars

What affects the design in Notting Hill?

  • Old walls and shallow footings need careful design at the junction
  • Allow longer for approvals, typically three to four months
  • Listed building consent is needed for any work that affects a listed house

Summers here are among the warmest in the UK, so solar control glass and an opening roof vent are worth having on south and west facing rooms. Being 1 miles from Shepherds Bush puts Notting Hill well inside the area we cover in Greater London.

Do you need planning permission in Notting Hill?

In England an orangery is treated as a single-storey extension. Many are permitted development: up to 4m deep on a detached house or 3m on others, no higher than 4m, and covering no more than half the garden. Your local planning authority confirms the position for any individual house.

What happens after you enquire?

  1. Home visitWe come to Notting Hill, look at the house and garden and listen to what you want from the space.
  2. Written quoteA fixed quote follows with drawings, a specification and a payment schedule tied to stages.
  3. ApprovalsWe deal with planning where it is needed and make the building control application.
  4. On siteOne team builds the room, keeps the site tidy and hands over a finished space with its certificates.

Why use us in Notting Hill?

  • We match brick, mortar colour and window proportions to the house so the room does not look added on.
  • Quotes are fixed and in writing, with stage payments tied to work you can see.
  • You have one named contact from survey to handover.

Notting Hill: common questions answered

Can you build an orangery on a listed building?

Yes, with listed building consent. The design has to respect the character of the house, which usually means timber joinery, matching masonry and a junction that leaves historic fabric intact. Consent is separate from planning permission and both may be needed.

Do I need permission in a conservation area?

Permitted development rights are narrower in conservation areas, and some councils remove them altogether with an Article 4 direction. A rear orangery may still be allowed, but check with the planning authority before committing to a design.

Can you match the brick on my house in Notting Hill?

In most cases, yes. We take samples and photographs at survey and source a matching or reclaimed brick, with mortar mixed to the existing colour.

Do I need planning permission in Notting Hill?

Often not: many orangeries in England fall within permitted development. We check the planning history of your address in Notting Hill before you commit to a design.

How soon can you start in Notting Hill?

After you accept a quote, design, approvals and manufacture usually take four to eight weeks before work starts on site in Notting Hill. Planning permission, where needed, adds about eight weeks.

Get a written quote for Notting Hill: call 0800 088 6248 or fill in the short form.

Period Property Orangeries near Notting Hill

Other orangery services in Notting Hill

Ready to plan your orangery?

Book a free design visit or get a guide price in under a minute.

Get a guide price Call 0800 088 6248
Call usGet a quote