Orangeries UK

Orangery Design and Planning

Architectural drawings of an orangery with brick and paint samples on a desk

Orangery design and planning covers the paperwork that comes before a build: a measured survey, scaled drawings, a check against permitted development, any planning or listed building application, structural calculations and the Building Regulations submission.

You can use the service on its own and take the drawings to any builder, or carry it straight into a build with us. Either way you know what you are allowed to build and what it will look like before you commit.

How much do orangery design and planning cost?

£900 – £3,500Guide price before VAT, drawings and applications, council fees extra, West Midlands rates

Orangery design and planning typically cost £900 to £3,500 before VAT. London prices run about 24 per cent higher and the South East about 13 per cent higher; Wales, the North East and Northern Ireland run 5 to 10 per cent lower. See all orangery prices or use the guide price tool.

What is included?

  • Measured survey of the house and garden
  • Plan, elevation and section drawings to scale
  • Permitted development check against the current rules
  • Lawful Development Certificate application where useful
  • Householder planning application and supporting statement
  • Listed building consent and heritage statement where needed
  • Structural engineer's calculations for beams and foundations
  • Building Regulations drawings and application
  • Build-over agreement application where a sewer is close

What should you think about first?

  • A Lawful Development Certificate gives proof for a future sale
  • Councils aim to decide householder applications within eight weeks
  • Larger rear extensions may use the prior approval route in England
  • Rules differ in Wales, Scotland and Northern Ireland
  • Council and water company fees are charged at cost on top of ours

How does the work run?

  1. SurveyA surveyor measures the house, checks drains and boundaries and notes how the room will be used.
  2. Design and priceWe draw the room and send a fixed, itemised quote with no provisional sums where we can avoid them.
  3. PermissionsPlanning checks, structural calculations and building control are submitted for you.
  4. On siteOne team builds the room, keeps the site tidy and hands over a finished space with its certificates.

Questions about orangery design and planning

Do I need planning permission for an orangery?

Often not. In England an orangery is treated as a single-storey extension and many fall within permitted development. Listed buildings, flats, maisonettes and houses where the rights have been removed need a planning application.

Does an orangery need building regulations?

In most cases yes. An orangery that is open to the house, larger than 30m², or heated from the house system needs Building Regulations approval. Only a small, separated, independently heated room can be exempt in the way some conservatories are.

What is a Lawful Development Certificate?

It is a certificate from the council confirming that a proposed orangery is permitted development and does not need planning permission. It is optional, but useful evidence when you sell the house.

Where do we offer orangery design and planning?

Related orangery services

Ready to plan your orangery?

Book a free design visit or get a guide price in under a minute.

Get a guide price Call 0800 088 6248
Call usGet a quote