Orangeries UK

Period Property Orangeries in Bognor Regis

Traditional stone orangery with arched windows on a Georgian country house

Homeowners in Bognor Regis use us for orangeries for period and listed homes because the drawings, approvals and building work all sit with one firm. Homes in Bognor Regis range widely in age and style, so we match brick, bond and window proportions house by house.

A period property orangery is designed to sit comfortably against a Georgian, Victorian, Edwardian or older house, using proportions, mouldings and materials taken from the building itself. On listed buildings and in conservation areas it also has to satisfy the council's conservation officer.

What should you budget for a period property orangery in Bognor Regis?

£62,000 – £135,500Guide price before VAT, typical 20–30m² room, South East rates

Expect to pay between £62,000 and £135,500 plus VAT for a period property orangery in Bognor Regis (typical 20–30m² room). Prices are adjusted to rates in the South East and firmed up into a fixed quote after the design visit.

What is included?

  • Lead or zinc roof finishes and traditional rainwater goods
  • Building Regulations approval, with exemptions agreed where needed
  • Measured survey of the existing elevation and its details
  • Reclaimed or matched brick and natural stone
  • Lime mortar and traditional pointing where appropriate

What affects the design in Bognor Regis?

  • Pre-application advice from the council saves time on sensitive sites
  • Listed building consent is needed for any work that affects a listed house
  • Allow longer for approvals, typically three to four months

In the south, strong summer sun makes solar control glass in the lantern close to essential. We also work in Worthing, about 14 miles away, so a team is regularly in the area.

Planning and building control in Bognor Regis: what applies?

Under English permitted development rules, eaves within 2m of a boundary must stay under 3m, and materials should look similar to the house. Larger rear extensions can use the prior approval route, which involves a neighbour consultation.

How does the work run?

  1. Measure and briefThe first visit records dimensions, levels and services and sets a working budget.
  2. Written quoteA fixed quote follows with drawings, a specification and a payment schedule tied to stages.
  3. ConsentsWe confirm the planning position and lodge the building control application before work starts.
  4. Build and handoverGroundworks, structure, roof, glazing and finishes follow in sequence, ending with the completion certificate.

What do Bognor Regis customers get from us?

  • Sites are left safe and tidy each day, with skips and deliveries planned around your street.
  • Workmanship is covered by a written guarantee, and glazing and roofing carry their manufacturers' warranties.
  • Every new room is built to Building Regulations and finished with a completion certificate.

Bognor Regis: common questions answered

Can you build an orangery on a listed building?

Yes, with listed building consent. The design has to respect the character of the house, which usually means timber joinery, matching masonry and a junction that leaves historic fabric intact. Consent is separate from planning permission and both may be needed.

Do I need permission in a conservation area?

Permitted development rights are narrower in conservation areas, and some councils remove them altogether with an Article 4 direction. A rear orangery may still be allowed, but check with the planning authority before committing to a design.

Is the design visit in Bognor Regis free?

Yes. The first visit to your home in Bognor Regis is free and carries no obligation. We measure, discuss options and follow up with a written quote.

How long will the work take in Bognor Regis?

A new orangery usually takes six to ten weeks on site. Roof replacements and lantern changes take days, and most repairs are finished in one visit.

How soon can you start in Bognor Regis?

After you accept a quote, design, approvals and manufacture usually take four to eight weeks before work starts on site in Bognor Regis. Planning permission, where needed, adds about eight weeks.

Ready to price a period property orangery in Bognor Regis? Ring 0800 088 6248 or request a quote online.

Period Property Orangeries near Bognor Regis

Other orangery services in Bognor Regis

Ready to plan your orangery?

Book a free design visit or get a guide price in under a minute.

Get a guide price Call 0800 088 6248
Call usGet a quote