Orangeries UK

Orangery Design and Planning in Little Venice

Architectural drawings of an orangery with brick and paint samples on a desk

Homeowners in Little Venice use us for orangery design and planning because the drawings, approvals and building work all sit with one firm. In smaller places like Little Venice, plots are often larger and gardens deeper, which opens up the design options.

Orangery design and planning covers the paperwork that comes before a build: a measured survey, scaled drawings, a check against permitted development, any planning or listed building application, structural calculations and the Building Regulations submission.

What does orangery design and planning cost in Little Venice?

£1,100 – £4,350Guide price before VAT, drawings and applications, council fees extra, London rates

For Little Venice, our guide price for orangery design and planning is £1,100 to £4,350 plus VAT (drawings and applications, council fees extra). Prices are adjusted to rates in London and firmed up into a fixed quote after the design visit.

What do you get for the price?

  • Build-over agreement application where a sewer is close
  • Lawful Development Certificate application where useful
  • Plan, elevation and section drawings to scale
  • Listed building consent and heritage statement where needed
  • Structural engineer's calculations for beams and foundations

What affects the design in Little Venice?

  • Larger rear extensions may use the prior approval route in England
  • Council and water company fees are charged at cost on top of ours
  • A Lawful Development Certificate gives proof for a future sale

Summers here are among the warmest in the UK, so solar control glass and an opening roof vent are worth having on south and west facing rooms. Our surveyors cover Little Venice together with Maida Hill, 1 miles away.

What approvals are needed in Little Venice?

Most orangeries in England need Building Regulations approval even when planning permission is not required, because the room is open to the house or heated from it. We make the application and book the inspections.

How does the work run?

  1. Survey in Little VeniceA surveyor measures the house, checks drains and boundaries and notes how the room will be used.
  2. ProposalPlans, elevations and a written quote arrive together so you can see what the money buys.
  3. ApprovalsWe deal with planning where it is needed and make the building control application.
  4. ConstructionWork typically takes six to ten weeks on site for a new room, with a named contact throughout.

What do Little Venice customers get from us?

  • We tell you plainly when a cheaper option would do the job.
  • Every new room is built to Building Regulations and finished with a completion certificate.
  • Workmanship is covered by a written guarantee, and glazing and roofing carry their manufacturers' warranties.

Little Venice: common questions answered

Does an orangery need building regulations?

In most cases yes. An orangery that is open to the house, larger than 30m², or heated from the house system needs Building Regulations approval. Only a small, separated, independently heated room can be exempt in the way some conservatories are.

What is a Lawful Development Certificate?

It is a certificate from the council confirming that a proposed orangery is permitted development and does not need planning permission. It is optional, but useful evidence when you sell the house.

Who signs off the work in Little Venice?

Building control, either the local authority service for Little Venice or a registered building control approver, inspects the work and issues the completion certificate.

Do I need planning permission in Little Venice?

Often not: many orangeries in England fall within permitted development. We check the planning history of your address in Little Venice before you commit to a design.

How soon can you start in Little Venice?

After you accept a quote, design, approvals and manufacture usually take four to eight weeks before work starts on site in Little Venice. Planning permission, where needed, adds about eight weeks.

Tell us about your house in Little Venice and we will come back with dates for a visit.

Orangery Design and Planning near Little Venice

Other orangery services in Little Venice

Ready to plan your orangery?

Book a free design visit or get a guide price in under a minute.

Get a guide price Call 0800 088 6248
Call usGet a quote