Orangery Extensions in County Tyrone

Thinking about an orangery extension for a house in County Tyrone? Start with a free design visit and a written price for the whole job. Our County Tyrone coverage takes in Omagh, Strabane and Dungannon and 1 more towns.
An orangery extension is an orangery that is opened up to the house, with the old back wall removed or widened so the two spaces work as one room. It is treated as a full extension under Building Regulations, which means insulated floors, walls and roof and a calculation for the amount of glass.
What does an orangery extension cost in County Tyrone?
A realistic budget for an orangery extension in County Tyrone is £31,500 to £72,000 plus VAT (including structural opening). Prices are adjusted to rates in Northern Ireland and firmed up into a fixed quote after the design visit.
What does the work cover?
- Insulated floor, walls and roof to current Part L standards
- Full Building Regulations approval and completion certificate
- Roof lantern with solar control glass and optional opening vent
- Steel beam, padstones and temporary propping installed safely
- Heat-loss calculation where glazing exceeds the standard allowance
What should you plan for in County Tyrone?
- A boiler may need checking for the extra heating load
- Permitted development limits depend on the house type and past extensions
- Removing the back wall changes how the old room is lit and heated
Northern winters make insulation the priority: warm-deck roofs, insulated floors and glass with a low U-value.
Planning and building control in County Tyrone: what applies?
In Northern Ireland, Building Control approval comes from the local council. We submit the plans for your orangery in County Tyrone and arrange the site inspections.
What are the steps from visit to handover?
- Home visitWe come to County Tyrone, look at the house and garden and listen to what you want from the space.
- Design and priceWe draw the room and send a fixed, itemised quote with no provisional sums where we can avoid them.
- ApprovalsWe deal with planning where it is needed and make the building control application.
- ConstructionWork typically takes six to ten weeks on site for a new room, with a named contact throughout.
What do County Tyrone customers get from us?
- Quotes are fixed and in writing, with stage payments tied to work you can see.
- You have one named contact from survey to handover.
- We tell you plainly when a cheaper option would do the job.
What do people in County Tyrone ask us?
Do I need planning permission for an orangery extension?
Often not. In England many orangeries fall within permitted development, which allows a single-storey rear extension up to 4m deep on a detached house and 3m on other houses, subject to height and other limits. Listed buildings, flats and some designated areas need consent.
Is an orangery cheaper than an extension?
Costs are similar. An orangery uses more glass and joinery and less roof structure than a tiled extension, so the price per square metre ends up close to a well specified single-storey extension.
Do I need planning permission in County Tyrone?
It depends on size and position under Northern Ireland's permitted development rules. We check the planning history of your address in County Tyrone before you commit to a design.
How much does an orangery extension cost in County Tyrone?
In County Tyrone, orangery extensions typically cost £31,500 to £72,000 plus VAT (including structural opening). You get a fixed written quote after a survey.
Is the design visit in County Tyrone free?
Yes. The first visit to your home in County Tyrone is free and carries no obligation. We measure, discuss options and follow up with a written quote.
Tell us about your house in County Tyrone and we will come back with dates for a visit.
Orangery Extensions by town in County Tyrone
More in this area: all orangery services in County Tyrone · Orangery Extensions overview
Ready to plan your orangery?
Book a free design visit or get a guide price in under a minute.
Get a guide price Call 0800 088 6248